Whether you’re building a new home, subdividing, renovating, or connecting a business, we’re here to help you get safely and smoothly connected to the water and wastewater networks. 

Our role is to make the process clear, predictable, and transparent — from understanding what approvals you need, to supporting you through installation, inspections, and commissioning.

Our approach follows proven New Zealand water‑sector practices, including clear application forms, capacity checks, and guidance for homeowners and developers. This ensures your property is set up correctly and the wider network stays reliable for everyone.

 

New water and wastewater connections

Most new homes and buildings require a connection to the public drinking water and wastewater networks. This process typically includes:

  • Providing property details, plans, and proposed layout
  • Installing an approved water meter (for drinking water)
  • Arranging inspections where required
  • Signing off the connection for use

Our process mirrors the clear steps used by major New Zealand providers, ensuring your application includes all required information and is processed efficiently. Requirements such as property details, service type (water, wastewater, or both), and meter specifications follow industry standards.

We’ll guide you through the details so there are no surprises — whether you are connecting a standalone home or a multi‑unit development.

 

Relocating, upgrading, or disconnecting a service

If you are altering your home or site layout, you may need to:

  • Relocate a water meter
  • Upgrade meter size for higher demand
  • Separate shared meters
  • Modify or relocate wastewater laterals
  • Disconnect a service (e.g., for demolition or redevelopment)

These changes ensure your property remains compliant and safely connected as your needs evolve. The steps mirror common sector practice: submit details, allow for review, and ensure any required inspections are completed by qualified people.

Click here for form and guide

 

Developer applications and capacity checks

If you’re a developer creating new lots or multi‑unit housing, early engagement with us is essential. We assess:

  • Network capacity in your area
  • Expected water demand and wastewater flows
  • Infrastructure constraints
  • Timing of works
  • Any planned upgrades that may affect servicing

We follow a best‑practice approach:

  • Transparent information at the start
  • Early identification of constraints
  • Clear servicing expectations
  • Fair and consistent assessment

This prevents delays and ensures that developments are planned with reliable and sustainable network servicing in mind.

Click here for form and guide

 

Trade waste and commercial connections

If your business discharges non‑domestic wastewater (e.g., food production, workshops, laboratories), you may need a trade waste permit or special conditions. This protects the public network, treatment plants, and the environment.

While trade waste settings vary between regions, national expectations around wastewater performance, overflow reduction, and environmental management guide our approach. These expectations are part of Taumata Arowai’s oversight of wastewater networks and environmental performance standards.

We’ll help you understand:

  • Pre‑treatment requirements
  • Testing or monitoring obligations
  • Wastewater quality limits
  • Any additional charges for higher‑strength discharges

Click here for form and guide

 

Timeframes and service levels

We aim to make your connection process predictable and efficient. While exact timeframes depend on site complexity, inspection availability, and construction progress, our service principles include:

  • Clear guidance at the start
  • Fair and consistent assessment
  • Prompt communication if additional information is needed
  • Safe commissioning before use

We also align with sector norms on customer expectations — for example, utilities commonly publish target response times and transparent performance reporting for water‑related services.

We will apply this same transparency by publishing processing timeframes and service performance once the CCO is fully operational.

 

Your responsibilities during connection

For safety and compliance, homeowners and developers are responsible for:

  • Engaging qualified and approved contractors
  • Ensuring on‑site plumbing meets building codes
  • Protecting meters and pipes during construction
  • Installing required backflow prevention devices for high‑risk properties
  • Booking inspections when needed

Local bylaws set the framework for safe private‑property plumbing and backflow rules.

We’re here to guide you through each step, so your new connection is safe, compliant, and ready for long‑term use.